Hotel Furniture Brief: What to Include

· 2 min read

What to include in a furniture brief for a hotel or contract project — pieces, quantities, sizes, materials, finish and destination — for a faster quote.

The quickest way to an accurate furniture quote is a clear brief. Because we build to order rather than sell from stock, every quote is priced against your specification — so the more of it you can share up front, the fewer rounds of questions before a number comes back.

You don't need every answer on day one. Use this checklist as a guide: send what you have, and a person follows up on whatever is missing.

1. The pieces and how many

  • Each piece you need — for example beds, bedside tables, wardrobes, desks, lounge chairs or dining sets

  • The quantity of each, and whether it repeats across room types or outlets

  • Any pieces that must match furniture you already have

Quantity shapes the price: the same chair costs differently at five units and at five hundred. Our MOQ starts at a five-unit sample run — the MOQ, samples and containers guide explains how to plan volume.

2. Sizes and drawings

Give the overall width, depth and height of each piece, in centimetres if you can. A technical drawing, a reference photo or a link to a similar product all work — and if you have your own design, we can build to your drawing, label and packaging.

3. Materials and finish

  • The timber — for example sheesham, mango or acacia — or simply "open to suggestion"

  • The finish colour, or a sample you want matched

  • Upholstery fabric or leather, if any

  • Hardware and metal details

Not sure which timber suits the setting? The solid wood materials guide compares them. Whatever you choose, solid wood is kiln-dried to about 8–10% moisture so it stays stable after shipping.

4. Where it's going

  • The destination country and port

  • Your preferred Incoterm: EXW, FOB or CIF

  • Any market rules your importer or project has flagged

Every sea shipment is fumigated to ISPM-15 and export-packed, with legal-timber documentation provided. Market-specific requirements are confirmed per order — the compliance guide explains the common ones.

5. Your timeline

Tell us your opening or installation date. A production date is set once you approve the sample, and sea transit to your port is added on top — so build the sample-approval step into your programme. It's where quality is locked in.

Send your brief

A partial brief is a good start. Request a quote with whatever you have, and a person follows up with questions, a quote and a timeline.